Applications
References
Tüpraş Aliağa Refinery
- 2500 C Cooling Tower Repair and Reinforcement Works
- Old Fuel Dock Repair and Reinforcement Works
- 1300 Unit Fire Proofing Works
- Mass Housing reinforcement and Repair Works (Package No.3)
- Fuel Oil Distribution Companies’ Office Building Construction Works
Aygaz Filling Facilities
- Old LPG Tank Groundwork Reinforcement Works
Lafarge Aslanlı Cement Industries
- Cement Silo Repair and Reinforcement Works
Söke Flour Plant
- Production Building Repair and Reinforcement Works
Kiler Tower - Istanbul
- Disassembly Works of 4-Storey Building
TT Tourism - Cyprus
- Yeni Girne Hotel’s Cutting and Reinforcement Works
Korumar Hotel - Kuşadası
- Reinforcement and Hotel Restoration Works
Efes Oteli - İzmir
- Reinforcement and Repair Works
Within The Scope of NCB-B-REIN+REP-07 Package
- ZONGULDAK-ÇAYCUMA-NEBİOĞLU Elementary School
- ZONGULDAK -GÖKÇEBEY-KARAPINAR Elementary School
- ZONGULDAK-ALAPLI-AŞAĞIDAĞ Elementary School
- ZONGULDAK-DEVREK-ÖZBAĞI Elementary School
- ZONGULDAK-MERKEZ-SAPÇA Elementary School
- ZONGULDAK-MERKEZ-KOZLU CUMHURİYET Elementary School
- ZONGULDAK-MERKEZ-KOZLU CUMHURİYET Elementary School
- KASTAMONU-MERKEZ-ELYAKUT KÖYÜ Elementary School
- KASTAMONU-MERKEZ-SEPETÇİOĞLU Elementary School
- KASTAMONU-MERKEZ-CUMHURİYET Elementary School
- KASTAMONU-DADAY-SELALMAZ Elementary School
- KASTAMONU-TOSYA-FATİH Elementary School
- KASTAMONU-İNEBOLU-KORUPINAR Elementary School
- KASTAMONU-TAŞKÖPRÜ-ATATÜRK Elementary School
- KASTAMONU-TAŞKÖPRÜ-KÖÇEKLİ Elementary School
- KASTAMONU-TAŞKÖPRÜ-ÇETMİ Elementary School
- BARTIN-MERKEZ-KOZCAĞIZ Elementary School
- BARTIN-MERKEZ-GÜRGENPINARI Elementary School Repair and Reinforcement Works
Özyıldız Construction - İzmir
- Buca Racetrack Cutting and Core Works
Kar Construction - İzmir
- The Port Tower Cutting and Core Works
Reha Construction - İzmir
- Esenkent Building Complex Core Works
İdea Construction - İzmir
- Yenikale Manzara Evleri Core and Reinforcement Works
Çakır Construction - Bartın
- PTT General Directorate Building’s Reinforcement Work Tests
H. Avni Berber Construction
- Çiğli Auto Plaza Construction Core, Cutting and Iron Ore Planting Works
Denlab
- Core Sampling Works
İsolab
- Ore Testing Works
Kaanlab
- Core Sampling Works
Akdemir INC.
- Foça Rod Installing Works
Akdeniz Holding
- Aydın Kuşadası Bayraklı Dede Location Core Works
AKY Construction
- Tire PTT Directorate Ore Planting and Testing Works
Almak Modern Construction
- Bodrum Harbour Collision Mat Installation, Core Drilling Rod Hammering Works
Batı Basma Industries
- Torbalı Core Drilling Works
Birtur Tourism
- Bodrum Shear Wall Hydraulic Cutting Works
İsis Hotel BODRUM
- Core Drilling Works
Megapol Real Estate Investment INC.
- Salhane Business Center Ore Planting, Hydraulic Cutting and Core Works
- Sunucu Plaza Ore Planting, Hydraulic Cutting and Core Works
- Kordon Kule Ore Planting, Hydraulic Cutting and Core Works
- Hürriyet Plaza Ore Planting, Hydraulic Cutting and Core Works
Bozoğlu Construction
- Mavişehir Residence Core Drilling and Ore Planting Works
- Subway Building Site Ore Testing Works
Dekon Architecture
- Denizbank Uşak Branch, Core Sampling Works
Doğan Construction
- Çiğli Oyakbank Residence Core Drilling Works
Bodrum Grand Yazıcı Hotel
- Ore Planting and Core Drilling Works
Bodrum Çağdaş Villa Residence
- Hydraulic Cutting and Core Drilling Works
Nüklüer Engineering
- Çeşme Çarmıklı Construction Core, Cutting and Ore Planting Works
Soyak Construction
- Mavişehir Residence Core Works
Bodrum Yalıkavak Construction
- Core Drilling and Hydraulic Cutting Works
Tüpraş
- Aliağa Refinery Injection Works
Orbay Construction
- Petkim Aliağa Collision Mat Installation Works
Kent Hospital
- Core Works
Keremoğlu Construction
- Core, Hydraulic Cutting and Ore Planting Works
Akal Construction
- Core Works
Meta Architecture
- Core, Hydraulic Cutting and Ore Planting Works
Çerçelik
- Core Works
Çözüm Mutfak
- Ore Planting Works
Dabaklar Construction
- Core, Hydraulic Cutting and Ore Planting Works
Selen Project
- Uşak Denizbank Branch, Reinforcement Works
Efal Electronics
- Core Works
Safkar Air Condition
- Reinforcement Works
Egetek Machinery
- Sahilevleri Plaza Reinforcement Works
Auto King
- Joint Cutting Works
Erciyes Demir INC.
- Core Works
Schneider Electronics
- Core and Hydraulic Cutting Works
Ervin Engineering
- Air School Camp Core Works
Fasitex Textile
- Controlled Demolition Works
HCE Construction
- Çeşme PTT Building Reinforcement Works
Kanyol Hotel
- Epoxy Injection Works
Kardemir Rolling
- Core and Ore Planting Works
İş Bankası
- Kemalpaşa Branch, Core Works
Movenpick Hotel
- Core Works
Nida Construction
- Core Works
Nurol Construction
- Kuşadası Nurol Plaza Reinforcement Works
Sevinç Patisserie
- Controlled Demolition Works
Pe-Ma Mantar
- Controlled Demolition Works
Öztüre Demir INC.
- Core Works
Sports International
- Parking Lot Carbon Reinforcement and Epoxy Injection Works
Tesco Kipa
- Salihli Kipa Injection Works
Turgutlu Municipality
- Sports Facilities Core and Reinforcement Works
Uzman Engineering
- Core and Ore Planting Works
Yasa Construction
- Core Works
Uzunlar Construction
- Core and Hydraulic Cutting Works
Yalıkavak Construction
- Core, Ore Planting and Cutting Works
TOKİ Residence - MANİSA
- Core Works
Gönen Çamlıköy Residence Seferihisar İZMİR
- Core Works
Pınar Süt - İZMİR
- Epoxy Injection Works
Batman Flour Plant - BATMAN
- Core and Hydraulic Cutting Works
Tire Fatih Elementary School Tire - İZMİR
- Ore Planting Works
Kızılay Building - Manisa
- Ore Planting Works
- Reinforcement
Kar Construction - İZMİR
- Kar Construction - İZMİR
- Core Works
Kılıçlar Balık Güllük - BODRUM
- Hydraulic Cutting and Controlled Demolition Works
Denizbank Germencik Branch - AYDIN
- Hydraulic Cutting and Controlled Demolition Works
TOKİ High School Akhisar - MANİSA
- Core Works
Hollywood Movie Theatre - MANİSA
- Reinforcement Applications
Ev-Kur Manisa Branch - MANİSA
- Core Works
Afyon Cement - AFYON
- Hydraulic Cutting Works
Mehmet GÖK - ISPARTA
- Hydraulic Cutting Works
- Core Works
Başarı Construction - İZMİR
- Narlıdere Underpass Epoxy Injection Works
Pınar Balık Ildır Çeşme - İZMİR
- Ore Planting and Controlled Demolition Works in Fish Production Site
ELB Architecture
- İTOB Cuma Valley Hydraulic Cutting Works
Bakırcıoğlu Construction - İZMİR
- Yensu Bayraklı Branch, Joint Cutting Works
Gelişim College Ulukent - İZMİR
- Core Works
Emre Beach - Marmaris
- Core Works
1145/13 Sokak No:24
Hırdavatçılar Çarşısı
Yenişehir İZMİR
Hırdavatçılar Çarşısı
Yenişehir İZMİR
Tel: 0 (232) 449 53 63 Pbx
Fax: 0 (232) 449 53 00
Fax: 0 (232) 449 53 00
Türkçe Sayfalar
English Pages