References

Tüpraş Aliağa Refinery

  • 2500 C Cooling Tower Repair and Reinforcement Works
  • Old Fuel Dock Repair and Reinforcement Works
  • 1300 Unit Fire Proofing Works
  • Mass Housing reinforcement and Repair Works (Package No.3)
  • Fuel Oil Distribution Companies’ Office Building Construction Works

Aygaz Filling Facilities

  • Old LPG Tank Groundwork Reinforcement Works

Lafarge Aslanlı Cement Industries

  • Cement Silo Repair and Reinforcement Works

Söke Flour Plant

  • Production Building Repair and Reinforcement Works

Kiler Tower - Istanbul

  • Disassembly Works of 4-Storey Building

TT Tourism - Cyprus

  • Yeni Girne Hotel’s Cutting and Reinforcement Works

Korumar Hotel - Kuşadası

  • Reinforcement and Hotel Restoration Works

Efes Oteli - İzmir

  • Reinforcement and Repair Works

Within The Scope of NCB-B-REIN+REP-07 Package

  • ZONGULDAK-ÇAYCUMA-NEBİOĞLU Elementary School
  • ZONGULDAK -GÖKÇEBEY-KARAPINAR Elementary School
  • ZONGULDAK-ALAPLI-AŞAĞIDAĞ Elementary School
  • ZONGULDAK-DEVREK-ÖZBAĞI Elementary School
  • ZONGULDAK-MERKEZ-SAPÇA Elementary School
  • ZONGULDAK-MERKEZ-KOZLU CUMHURİYET Elementary School
  • ZONGULDAK-MERKEZ-KOZLU CUMHURİYET Elementary School
  • KASTAMONU-MERKEZ-ELYAKUT KÖYÜ Elementary School
  • KASTAMONU-MERKEZ-SEPETÇİOĞLU Elementary School
  • KASTAMONU-MERKEZ-CUMHURİYET Elementary School
  • KASTAMONU-DADAY-SELALMAZ Elementary School
  • KASTAMONU-TOSYA-FATİH Elementary School
  • KASTAMONU-İNEBOLU-KORUPINAR Elementary School
  • KASTAMONU-TAŞKÖPRÜ-ATATÜRK Elementary School
  • KASTAMONU-TAŞKÖPRÜ-KÖÇEKLİ Elementary School
  • KASTAMONU-TAŞKÖPRÜ-ÇETMİ Elementary School
  • BARTIN-MERKEZ-KOZCAĞIZ Elementary School
  • BARTIN-MERKEZ-GÜRGENPINARI Elementary School Repair and Reinforcement Works

Özyıldız Construction - İzmir

  • Buca Racetrack Cutting and Core Works

Kar Construction - İzmir

  • The Port Tower Cutting and Core Works

Reha Construction - İzmir

  • Esenkent Building Complex Core Works

İdea Construction - İzmir

  • Yenikale Manzara Evleri Core and Reinforcement Works

Çakır Construction - Bartın

  • PTT General Directorate Building’s Reinforcement Work Tests

H. Avni Berber Construction

  • Çiğli Auto Plaza Construction Core, Cutting and Iron Ore Planting Works

Denlab

  • Core Sampling Works

İsolab

  • Ore Testing Works

Kaanlab

  • Core Sampling Works

Akdemir INC.

  • Foça Rod Installing Works

Akdeniz Holding

  • Aydın Kuşadası Bayraklı Dede Location Core Works

AKY Construction

  • Tire PTT Directorate Ore Planting and Testing Works

Almak Modern Construction

  • Bodrum Harbour Collision Mat Installation, Core Drilling Rod Hammering Works

Batı Basma Industries

  • Torbalı Core Drilling Works

Birtur Tourism

  • Bodrum Shear Wall Hydraulic Cutting Works

İsis Hotel BODRUM

  • Core Drilling Works

Megapol Real Estate Investment INC.

  • Salhane Business Center Ore Planting, Hydraulic Cutting and Core Works
  • Sunucu Plaza Ore Planting, Hydraulic Cutting and Core Works
  • Kordon Kule Ore Planting, Hydraulic Cutting and Core Works
  • Hürriyet Plaza Ore Planting, Hydraulic Cutting and Core Works

Bozoğlu Construction

  • Mavişehir Residence Core Drilling and Ore Planting Works
  • Subway Building Site Ore Testing Works

Dekon Architecture

  • Denizbank Uşak Branch, Core Sampling Works

Doğan Construction

  • Çiğli Oyakbank Residence Core Drilling Works

Bodrum Grand Yazıcı Hotel

  • Ore Planting and Core Drilling Works

Bodrum Çağdaş Villa Residence

  • Hydraulic Cutting and Core Drilling Works

Nüklüer Engineering

  • Çeşme Çarmıklı Construction Core, Cutting and Ore Planting Works

Soyak Construction

  • Mavişehir Residence Core Works

Bodrum Yalıkavak Construction

  • Core Drilling and Hydraulic Cutting Works

Tüpraş

  • Aliağa Refinery Injection Works

Orbay Construction

  • Petkim Aliağa Collision Mat Installation Works

Kent Hospital

  • Core Works

Keremoğlu Construction

  • Core, Hydraulic Cutting and Ore Planting Works

Akal Construction

  • Core Works

Meta Architecture

  • Core, Hydraulic Cutting and Ore Planting Works

Çerçelik

  • Core Works

Çözüm Mutfak

  • Ore Planting Works

Dabaklar Construction

  • Core, Hydraulic Cutting and Ore Planting Works

Selen Project

  • Uşak Denizbank Branch, Reinforcement Works

Efal Electronics

  • Core Works

Safkar Air Condition

  • Reinforcement Works

Egetek Machinery

  • Sahilevleri Plaza Reinforcement Works

Auto King

  • Joint Cutting Works

Erciyes Demir INC.

  • Core Works

Schneider Electronics

  • Core and Hydraulic Cutting Works

Ervin Engineering

  • Air School Camp Core Works

Fasitex Textile

  • Controlled Demolition Works

HCE Construction

  • Çeşme PTT  Building Reinforcement Works

Kanyol Hotel

  • Epoxy Injection Works

Kardemir Rolling

  • Core and Ore Planting Works

İş Bankası

  • Kemalpaşa Branch, Core Works

Movenpick Hotel

  • Core Works

Nida Construction

  • Core Works

Nurol Construction

  • Kuşadası Nurol Plaza Reinforcement Works

Sevinç Patisserie

  • Controlled Demolition Works

Pe-Ma Mantar

  • Controlled Demolition Works

Öztüre Demir INC.

  • Core Works

Sports International

  • Parking Lot Carbon Reinforcement and Epoxy Injection Works

Tesco Kipa

  • Salihli Kipa Injection Works

Turgutlu Municipality

  • Sports Facilities Core and Reinforcement Works

Uzman Engineering

  • Core and Ore Planting Works

Yasa Construction

  • Core Works

Uzunlar Construction

  • Core and Hydraulic Cutting Works

Yalıkavak Construction

  • Core, Ore Planting and Cutting Works

TOKİ Residence - MANİSA

  • Core Works

Gönen Çamlıköy Residence Seferihisar İZMİR

  • Core Works

Pınar Süt - İZMİR

  • Epoxy Injection Works

Batman Flour Plant - BATMAN

  • Core and Hydraulic Cutting Works

Tire Fatih Elementary School Tire - İZMİR

  • Ore Planting Works

Kızılay Building - Manisa

  • Ore Planting Works
  • Reinforcement

Kar Construction - İZMİR

  • Kar Construction - İZMİR
  • Core Works

Kılıçlar Balık Güllük - BODRUM

  • Hydraulic Cutting and Controlled Demolition Works

Denizbank Germencik Branch - AYDIN

  • Hydraulic Cutting and Controlled Demolition Works

TOKİ High School Akhisar - MANİSA

  • Core Works

Hollywood Movie Theatre - MANİSA

  • Reinforcement Applications

Ev-Kur Manisa Branch - MANİSA

  • Core Works

Afyon Cement - AFYON

  • Hydraulic Cutting Works

Mehmet GÖK - ISPARTA

  • Hydraulic Cutting Works
  • Core Works

Başarı Construction - İZMİR

  • Narlıdere Underpass Epoxy Injection Works

Pınar Balık Ildır Çeşme - İZMİR

  • Ore Planting and Controlled Demolition Works in Fish Production Site

ELB Architecture

  • İTOB Cuma Valley Hydraulic Cutting Works

Bakırcıoğlu Construction - İZMİR

  • Yensu Bayraklı Branch, Joint Cutting Works

Gelişim College Ulukent - İZMİR

  • Core Works

Emre Beach - Marmaris

  • Core Works
1145/13 Sokak No:24
Hırdavatçılar Çarşısı
Yenişehir İZMİR
Tel: 0 (232) 449 53 63 Pbx
Fax: 0 (232) 449 53 00